✳ Security Fit Map / OT-SECURITY / Protocol v1.0

Passive visibility in a manufacturing plant

A discrete manufacturing plant with a segmented control network, mixed legacy equipment, and engineers who must approve any active probing.

UNASSESSED · RESEARCH PROTOCOL · 2026-09-19

This edition publishes the evaluation question and work still required. It contains no scored vendor points.

What must be true

  • Required industrial protocols and device types are identified passively.
  • A seeded change to a controller is reported to both teams.
  • Monitoring needs no unapproved active probing, and any outbound connection is declared for approval.

Candidate scope

Two publicly documented offerings form a small pilot. Inclusion is for methodology development, not a claim that these are the only or best choices. Exact tiers and test configurations must be frozen before scoring.

OfferingScopeStatus
GuardianThis profile covers Guardian and its local analyst functions. Vantage cloud management, Central Management Console, Arc host sensors, Threat Intelligence and Asset Intelligence subscriptions must be scoped separately.Unassessed
Capability: null
Operating: null
Microsoft Defender for IoT (OT monitoring)OT monitoring is distinct from Enterprise IoT features associated with Defender for Endpoint. The legacy on-premises management console retired in January 2025; individual air-gapped sensors remain supported. The documented Defender portal experience is preview, so this profile uses the Azure portal and sensor workflow.Unassessed
Capability: null
Operating: null

Evidence still needed

  • A frozen device, protocol, and network tap inventory
  • Repeatable discovery and detection tests in a lab or maintenance window
  • Sensor placement, management effort, and licensing evidence

How the evaluation will work

  1. Fix the workload, organizational assumptions, product editions, and mandatory requirements.
  2. Publish criterion-specific 0–5 anchors before collecting results.
  3. Collect reproducible observations, source dates, and operating measurements. Preserve contradictory evidence.
  4. Use the rubric below without filling unknowns with estimates.
  5. Have a second reviewer reproduce results. Publish only after both axes reach 80% coverage and critical requirements have explicit results.
AxisCriterionWeight
capabilityRequired functions40%
capabilityRepresentative effectiveness30%
capabilityEvidence and explainability15%
capabilityRequired data exchange15%
operatingStaffing and administration30%
operatingEnvironment and deployment25%
operatingIntegration maintenance20%
operatingPortability and exit15%
operatingCost predictability10%

Threshold: 70/100 on each axis. A missing-evidence interval that spans 70 prevents a definitive quadrant label. A critical failure blocks a shortlist recommendation.

Download this research protocol ↓

Find your next idea.

Tip: press / to open search. Escape closes this window.